FLY-ASH INTRODUCTION

FLY-ASH INTRODUCTION. Fly ash brick First invented in 2007..... American civil engineer Henry liu announced the invention of a new type of fly ash brick in 2007. Lius’s brick is compressed of at 4,ooo psi and cured for 24 hrs in a 150 F(66 C) steam bath, then toughened with air entrainment agent , so that it lasts for more than 100 freeze thaw cycles. Owing to high concentration of calcium in class c fly ash , the brick can be described as self cementing. Since method contains no clay and uses pressure instead of heat ,it saves energy, reduces mercury pollution,costs 20% less than traditional manufacturing techniques.  This type of brick is now manufactured under license in USA.  Fly ash bricks are constructed at least partially from the residue of burnt coal .Depending on the type of coal that is burned, the resulting fly ash can take a number of different forms. Some kinds of fly ash require a cementing agent, such as quicklime or Portland cement . Other types contain a larg...

FLY-ASH

Image
1                                                             ABSTRACT This study presents the investigations of effect of fly-ash on concrete containing slag. Cement is a costly material and is used extensively for construction works all over the world. Replacing a certain fraction of cement by fly-ash contributes to the strength of concrete due to its pozzolanic reactivity. However, since pozzolanic reaction is slow, the initial strength is low.  fig-1. This pozzolanic reaction also makes the structure of concrete denser, resulting in decrease in water and gas permeability. Slag is generated during iron and steel production. The addition of slag reduces the rate of heat evolution and increases the resistance to chemical attack. It is made use of in hot regions due to less effect on early strength of concrete. The percentage of ...

EXCAVATION

Image
  EXCAVATION - is the process of moving things like earth ,rocks or other material with tools, equipment and explosives. it is first activity  of construction projects. excavation WORKING PROCEDURE OF EXCAVATION, 1) The first activity or first step in excavation is to find out the extent of soil. 2) Cleaning or clearing of of construction site is an unwanted bushes,weeds and plants. 3) Ground Tracing is the process of laying down the excavation lines on the ground before excavation started. 4) Tracing is marked by lime powder with the reference of drawing and benchmarks the depth of the excavation is fixed . 5) Excavation is done by machine or manual depends on the availability or requirement,  6) Excavated soil or material removed out and  shift out of the site or stock around the excavation pit minimum 1m to 1.5m   distance must be maintained between the stocking material and pit  7) Dressing of excavated pits is to be done as per drawings. prop...

CIVIL ENGINEERING,

Image
  CIVIL ENGINEERING   -     is a professional engineering discipline which deals with the study of  design, construction, and maintenance of the physical and naturally built environmen t, including public works such as roads, bridges, canals, buildings dams,   railways  , airports, sewage systems, pipelines and  structural components of buildings.